City of Germantown
Home MenuFiber Optic Utility
Right-of-Way contractors MUST have a City of Germantown Business Tax License and bond. This license and bond allow contractors to legally work within the city and public right-of-way.
This guide explains the process for applying for a utility permit in Germantown. We've streamlined the steps to make it as easy as possible for you through our online portal linked above.
Before You Apply:
- Franchise Owner: The franchise owner must have all required documentation on file:
- Contractor: The contractor must be have all required documentation on file:
What you need to fill out your permit application online:
-
Applicant Information: Provide owner, subcontractor, and project contact information so we can reach you throughout the process.
-
Description of Work Proposed: Briefly explain the nature of your project.
-
Location of Work Proposed: Clearly describe the location where the work will be done. Needs to be the nearest Street address to the beginning point.
-
Proposed Utility Route: A .Zip containing a shapefile (not KMZ) is required in order to indicate the planned path for your utility installation. (Not sure what these are? We can help!)
-
Construction Plans (Must be stamped and to scale):
-
Show the location and route of all existing facilities
-
Detail the location, route, line, length, and grade for all proposed underground facilities.
-
Provide the number of proposed conduits to be installed.
-
Describe methods for temporarily protecting existing structures.
-
Provide Traffic control documentation (Must be MUTCD compliant)
-
-
TDOT, Railroad and ROW Permits: Need to be obtained and submitted with permit application prior to performing work within the applicable right-of-way.
Standard Construction Notes:
