Fiber Optic Utility

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Right-of-Way contractors MUST have a City of Germantown Business Tax License and bond. This license and bond allow contractors to legally work within the city and public right-of-way.

This guide explains the process for applying for a utility permit in Germantown. We've streamlined the steps to make it as easy as possible for you through our online portal linked above.


Before You Apply:

  • Franchise Owner: The franchise owner must have all required documentation on file:
    • Franchise Agreement: State-wide or City of Germantown
    • Letter of Credit (requires annual renewal) [Link]
    • Insurance Certificate example (requires annual renewal) [Link]
    • Germantown Business Tax License [Link]
  • Contractor: The contractor must be have all required documentation on file:
    • Insurance Certificate (requires annual renewal) [Link]
    • Germantown Business Tax License [Link]


What you need to fill out your permit application online:

  • Applicant Information: Provide owner, subcontractor, and project contact information so we can reach you throughout the process.

  • Description of Work Proposed: Briefly explain the nature of your project.

  • Location of Work Proposed: Clearly describe the location where the work will be done. Needs to be the nearest Street address to the beginning point.

  • Proposed Utility Route:  A .Zip containing a shapefile (not KMZ) is required in order to indicate the planned path for your utility installation. (Not sure what these are? We can help!)

  • Construction Plans (Must be stamped and to scale):

    • Show the location and route of all existing facilities

    • Detail the location, route, line, length, and grade for all proposed underground facilities.

    • Provide the number of proposed conduits to be installed.

    • Describe methods for temporarily protecting existing structures.

    • Provide Traffic control documentation (Must be MUTCD compliant)

  • TDOT, Railroad and ROW Permits: Need to be obtained and submitted with permit application prior  to performing work within the applicable right-of-way.

 

 

Standard Construction Notes:

Construction detail     Construction specs     Construction Notes  Standard Boring Notes